on power lines: tenders, rfq bids, opportunities and procurement 2025. Page № 29


Total: 2298
18 oct

Number: 92714017

Country: Hungary

Source: TED

18 oct

Number: 92714040

Country: Germany

Source: TED

18 oct
Overhead power lines (EN BG) add to Favorites
Contract value: 11 678 298 (USD)
Price original: 23 312 102 (BGN)

Customer: НАЦИОНАЛНА КОМПАНИЯ "ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА" ДП

Number: 92714570

Country: Bulgaria

Source: TED

18 oct

Number: 92714681

Country: Germany

Source: TED

18 oct

Number: 92714733

Country: Germany

Source: TED

17 oct
Construction work for pipelines, communication and power lines (EN DE) add to Favorites
Contract value: 5 882 872 (USD)
Price original: 6 000 000 (EUR)

Customer: Zweckverband Wasserversorgungsgruppe Mühlbach

Number: 92645375

Country: Germany

Source: TED

17 oct

Number: 92645933

Country: France

Source: TED

17 oct
Construction work for electricity power lines (EN FR) add to Favorites
Contract value: 498 818 523 (USD)
Price original: 508 750 000 (EUR)

Customer: Enedis

Number: 92647361

Country: France

Source: TED

17 oct
Eskom Holdings SOC Ltd (hereinafter “Eskom”) invites you to submit a tender for the following: Provision of boiler washing, unblocking and vacuuming for a period of 36 months at Camden Power Station. Scope of works: Cleaning - vacuuming: • Evaporator bottom dead space (front and rear); • Top nose dead space; • Penthouse dead space; • Boiler house rooftop (52m level); • Explosion damper vacuuming; • Steam drum cleaning after stripping internal components; • Air heater trench vacuuming; • Air heater vacuuming; • Mill internal vacuuming; • Mill gearbox cleaning and vacuuming. Cleaning - high pressure washing: • Boiler ash hopper tubes; • Evaporator dead space (front and rear); • Full boiler Furness i.e., evaporator walls, roof tubes, super heater 3 and 4 elements superheater 1 and 2 elements; • Top nose dead space; • Economiser top and bottom bank elements; • Unblocking and high-pressure cleaning of the Economizer hopper; • High Pressure cleaning or removal of ash build-ups on boiler tubing; • Boiler washing on the ash box sealing trough; • Boiler drain and impulse lines. Air heater vacuuming and cleaning: a) Vacuum all the ash out of air heater casings and duct areas adjacent to the air heater; b) Wash the ducts and air heater casing with low pressure jet to eliminate the ash – allow water to drain by opening drainage system before washing; c) Vacuuming and cleaning of ash on the air heater crossover ducts. Pf pipes vacuuming: a) Vacuum all debris that are blocking the Pf pipes; b) Vacuuming of ash and debris inside the mill. FFP Hoppers; a) Unblocking and removing of clinkers in FFP hoppers using high pressure machine with water use of high-pressure machine only to be used if unblocking by poking has failed; b) Hoppers will only be considered unblocked if clinkers are completely removed. (not just ash flowing). Modification of the nozzle might be necessary to enable unblocking without removal of square to rounds but this will be advised once / if finalized. Vacuuming of FFP ducting: a) Removal of ash / dust from FFP ducting by vacuum cleaning; b) Removal of ash / dust from inside FFP Cells (on tube plates and ducting where bags are located). PF burners and wind box cleaning: a) Vacuuming and cleaning of ash / dust from within each wind box row. 5 rows per unit, PF/dust may be hot (>40° Celsius); b) Vacuuming /cleaning of dust from wind box damper shaft mountings on wind box rear (4 areas per set of wind box damper vanes – 40 areas per unit); c) Vacuuming of wind box roof of PF/dust. This dust may be hot (>40° Celsius) - External vacuuming; d) Vacuuming of individuals PF burners (if not catered for under PF pipes). Equipment: a) High Pressure washing machine that has a minimum output pressure of 1000 bar. b) Vacuuming truck must be supplied and operate with: i. Minimum of 1000 bars suction pressure; ii. The capacity of the collectors body tank must have minimum of 10 000L; iii. The tank must be designed to handle minimum temperature of 40° Celsius; c) Fittings and pipework to handle minimum temperature and pressure; d) Cleaning or housekeeping material. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 92666014

Country: South Africa

Source: ONLINE TENDERS

13 oct
Electricity power lines (EN ES) add to Favorites
Customer: Director Gerente de Mutua Intercomarcal MATEPSS Nº 39
Source: Director Gerente de Mutua Intercomarcal Matepss nº 39

Number: 92469724

Country: Spain

Source: TED