Lejweleputswa District Municipality hereby requests quotations from reliable and reputable service providers for the following: Hiring of grass cutting tractors with heavy duty slashers. (Tender №101480289)

Country: South Africa
Language: EN
Number: 101480289
Publication date: 18-03-2024
Source:

Description

Full information on the tender is closed.
For further work with the site read the information below.

About us

Leading searching system of world tenders

  • Largest database of tenders and sources of procurement of the World
  • Free daily mailings according to Your settings
  • Winners information
  • Convenient display and downloading of information

Choose us

Getting Started

After site registration, this functions will be available to You

  • Subscription to free mailing list for your keyword phrases
  • Tenders announcements previews
  • Download summary information in Excel format
  • View information about tender winners, suppliers and customers

REGISTER

For using all functions of our site and view full information you need to register a commercial account

  • Selected period
  • Pay access in any of the possible ways

Get full access

Other tenders for this period

Cape Agulhas Municipality is currently awaiting tenders for the provision of small plant hire for a period of three years ending 30 June 2027. Source: ONLINE TENDERS

Quotations are hereby invited for the following: - Manhole ring, 1000 x 250mm (Brand name), UOM: Each, qty: 120, - Manhole rings + steps, 750mm x 250mm, concrete, UOM: Each, qty: 150. Source: ONLINE TENDERS

Cape Agulhas Municipality is currently awaiting tenders for the Supply & Delivery of Storm Water Pipes for a period of three years ending 30 June 2027. Source: ONLINE TENDERS

Re-advertisement: Mintek herewith requests suitably qualified persons, companies or consortia to bid for the provision of the following: Procurement of a fuel cell test station. Specifications: Fuel cell test station: - 100:1 turndown (max:min flow) on all mass flow controllers (MFC); - 5 NLPM max. humidified anode flow, 4 x MFC: N2, H2, CO, CH4; - 10 NLPM max. humidified cathode flow, 2 x MFC: Air/N2, O2 (automated blending of gases); - 316SS (or higher grade) for all di-water and humidified gas-handling components; - Automatic contact humidification module (up to 90°C dew point); - Automated humidifier bypass with 100% full isolation of humidifier permits delivery of facility-supplied gas directly to stack; - Electric reheat module (up to 110°C inlet gas); - N2 purge rotameters on anode and cathode; activated on e-stop or user command; - Automatic back pressure control module (0-3 barg); - Stack end-plate heater PID controllers, 2 x 2A max (AC mains voltage; 1 phase); - Automated liquid coolant/heating module: 0.15-1.5LPM, 40-90°C, 0-3barg; - Programmable air cooled load bank with dual range operation (10%/100%). Maximum: 650W, 10V, 120A, max. current down to 0.0V at stack (zero volt compensation included); - 5 CVM included; - PC with widescreen flat panel monitor, including control and automation software; - H2 gas detector for test station, E-stop and warning; - Onsite commissioning and face-to-face user training, including onsite expenses. Potentiostat/galvanostat: - Fully integrated; - Cyclic and linear voltammetry; - Automated pneumatic cell/ stack compression control on test station; - Single frequency EIS; - Multi-frequency AC HFR device; - Cell reversal testing capability. The fuel cell test station is required at Mintek’s premises located at number 200 Malibongwe Drive, Strydom Park, Randburg. Location of project site: Gauteng. Source: ONLINE TENDERS

Tenders are hereby invited for the following: Development of an Environmental Management Framework. The scope of work will include the following key aspects: - Phase 1. Project inception and workplan; - Phase 2. Status Quo Analysis (SQA) and report; - Phase 3. Desired State and Gap Analysis Report: 1. Evaluation of Alternatives and Scenarios; - Phase 4. Draft and final Environmental Management Framework: 1. Strategy for implementation of the EMF shall be developed; 2. Stakeholder Consultation; - Phase 5. Project Close-Out Report. The following are the desired outcomes of the EMF: (a) Integrate the outcome of the desired state of the environment; (b) Clearly define and address any management objectives which have been established and identified through the development of the desired state of the environment; (c) Maximize the opportunities to the benefit of both environment and development in the area; (d) Make clear recommendations regarding the way that development should occur in a specific geographical area; (e) Provide guidance as to the environmental thresholds to development in a geographical area; (f) Identify development that will not be appropriate in sensitive area and manage the constrains of the area through interventions that seek to protect the environment against significant impacts while being sensitive to the social needs and aspiration in the area; (g) Recommendations for implementation and monitoring; (h) Public-Private Partnership (PPP), in line with the relevant legislative prescripts. Source: ONLINE TENDERS

Cape Agulhas Municipality is currently awaiting tenders for the plant hire for construction purposes for a period of three years ending 30 June 2027. Source: ONLINE TENDERS