boiler: tenders, rfq bids, opportunities and procurement 2024. Page № 11


Total: 5889
09 apr

Number: 102519881

Country: Canada

Source: www.merx.com

09 apr

Number: 102519895

Country: Canada

Source: www.merx.com

09 apr
Quotations are hereby invited for the following: Major service and 36-month statutory inspection of Boiler 2 (John Thompson coal-fired steam boiler) as well as ancillary equipment neglected in the boiler house: Specifications: • Strip the boiler as required for external and internal inspection, • Chemical clean of water side (acid wash), • HP cleaning of tubes, as required, • Sand blasting of tubes & shell, as required, • Service/repair of stoker mat and stoker drive, • Service of all valves, including test certificates for safety valves, • Calibration of pressure gauges, • Refurbishment of gauge glass assembly, cocks, and Mabrey level controls, • Refurbish the FD fan, and ID fan (replace all belts and bearings), • Replacement of guillotine door, and cables, • Replace ignition arch, side seals, etc, • Rebuild the ash wall, • Refurbish 2 x Grundfos feed pumps, • Clean out the electrical panel, • Prepare the boiler for 3-year statutory inspection, • Provide a certified AIA inspection authority to conduct a complete statutory inspection, including pressure test in accordance with the PER 36-month inspection requirements, • Reassemble the boiler, including all new gaskets, lagging and stainless-steel cladding, and refractory brickwork, • Re-commission the boiler and test all safety functions, • Provide a hardcopy inspection book including all test certificates, service records, and certificate of continuance, • Compressor hire must be provided by the contractor, as there is no compressed air supply available in the boiler house, • Any scaffold hire, scaffold erection & inspection must be provided by the contractor, • Replace grit collector, • Replace ash trolley for grit collector, • Replace impellor on ID fan, • Install a Shut of valve on main steam line to factory, • Replace condensate line and replace condensate pumps, from EA to hot well, • Install meter at discharge on hot well, • Overhaul suit blower for boiler no 1 & 2, • Provide project plan and time frame. A standard Safety File must be submitted in hardcopy prior to any work commencing on site. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 102531312

Country: South Africa

Source: ONLINE TENDERS

09 apr
EXTERNAL, INTERNAL CLEANING OF OUR 3 BOILER (EN) add to Favorites
Customer: eProcurement System Government of Uttar Pradesh

Number: 102534915

Country: India

Source: Central public Procurement portal India

09 apr
Boiler Replacement IC4 Building, University Of Keele (EN) add to Favorites
Contract value: 71 360 (USD)
Price original: 64 000 (GBP)

Deadline: 1 days
Customer: Keele University

Number: 102540425

Country: United Kingdom

Source: gov.uk Contracts Finder

09 apr
Boiler Replacement IC3 Building, University Of Keele. (EN) add to Favorites
Contract value: 141 047 (USD)
Price original: 126 500 (GBP)

Deadline: 1 days
Customer: Keele University

Number: 102540426

Country: United Kingdom

Source: gov.uk Contracts Finder

09 apr

Number: 102540842

Country: Canada

Source: www.merx.com

08 apr

Number: 102442298

Country: Malaysia

Source: RFQ

08 apr
INTERNAL AND EXTERNAL CLEANING OF BOILER (EN) add to Favorites
Customer: eProcurement System Government of Haryana

Number: 102452090

Country: India

Source: Central public Procurement portal India

08 apr

Number: 102453217

Country: India

Source: Indiamart

08 apr

Number: 102459907

Country: India

Source: Indiamart

08 apr

Number: 102462554

Country: Czech Republic

Source: RFQ